Infrastructure

Infrastructure of Ontustik SEZ

Infrastructure of Ontustik SEZ

Gas pipeline
10 000
m3/h
Substation
160
MW
Water supply
50 232
m3/day
Sewerage
34 854
m3/day
Railway lines
2
lines
Installation of
250
numbers
Fire
station for
2
cars
Customs
station
1
station
Check Point
motor and rail
1
point
Customs
Committee
1
building
Tax
Committee
1
building
Managing
Company
1
building
Карта СЭЗ «Оңтүстік»

Total area

Public utilities are
cheaper by 25%

No.DESCRIPTIONDESIGN CAPACITYRATES
(IN KZT INCLUDING VAT)
1. Water supply 50 232 m3/day 92,06
2. Sewerage 34 854 m3/day 153,24
3. Electricity supply 160 MW 13,58
4. Gas supply 10 000 m3/h 36,106

Infrastructure of Ontustik SEZ

Gas pipeline
10 000
m3/h
Substation
160
MW
Water supply
50 232
m3/day
Sewerage
34 854
m3/day
Railway lines
2
lines
Installation of
250
numbers
Fire
station for
2
cars
Customs
station
1
station
Check Point
motor and rail
1
point
Customs
Committee
1
building
Tax
Committee
1
building
Managing
Company
1
building
Карта СЭЗ «Оңтүстік»

Total area

Public utilities are
cheaper by 25%

No.DESCRIPTIONDESIGN CAPACITYRATES
(IN KZT INCLUDING VAT)
1. Water supply 50 232 m3/day 92,06
2. Sewerage 34 854 m3/day 153,24
3. Electricity supply 160 MW 13,58
4. Gas supply 10 000 m3/h 36,106

Investments in the Present — Prosperity in the Future